Ashburn Data Center Campus

Scalable capacity with low-latency access to networks and clouds

EdgeCore’s Ashburn Campus is planned to support 144 MW of critical load across 720,000 square feet of new, state-of-the-art data centers. The location offers robust, low-latency access to Ashburn’s key points of interconnection.

4 Data Centers
720,000 Sq. Ft.
144 MW

Gallery

Specifications

Campus

Land Area
36.8 acres
Buildings
4 purpose-built data centers
Total Building Area
720,000 sq. ft.
Power
Dominion Energy operated substation designed to support 144 MW of critical load
Connectivity
Multiple fiber access points
Geographic risk
Low risk
Location
Sterling, Virginia

Building

Building Size
180,000 sq. ft.
Utility Power
36 MW
Fit Out
Powered shell, infrastructured shell, turn-key
Power Availability
AC & DC
Sustainability
Renewable power available
Environment
LEED Certified
Amenities
Dual loading docks, tech lounge, office space

Infrastructure

UPS
N, N+1, and 2N configurations with lithium-ion batteries
Generators
Back-up generators supporting N, N+1 and 2N configurations
Power availability
AC & DC
PUE
PUE < 1.25
Fuel storage
48 hours of run-time at full capacity
Mechanical
Air-cooled chillers with economization
Lighting
Zoned lighting controls with dimmable LEDs

Operations

Facilities
On-site 24x7 staffing
MOPs / SOPs
Standardized training and implementation
Uptime
100% uptime SLA
Power Availability
AC & DC
Security
On-site 24x7 staffing
Fencing
8' perimeter security fence
Surveillance
CCTV campus-wide surveillance

Amenities

Tech Lounge
Comfortable seating, workspaces, and kitchen
Staging Room
Staging room available for shipping and receiving needs
Office space
Dedicated office space available
Parking
Secure on-site parking
WiFi
Public WiFi available
Tools
IT tool-kit available on request
Lobby
Secure waiting area for data center visitors